Reply To: Combining Results from Multiple Runs into One HTML Report

Why OSVVM™? Forums OSVVM Combining Results from Multiple Runs into One HTML Report Reply To: Combining Results from Multiple Runs into One HTML Report

#2603
Jim Lewis
Member

Hi David,
Not yet. There are some planned changes coming later this year (2nd half) that should allow us to do this.

If you are thinking code coverage data, you should be able to merge the results from each build together using the tool provided methods. It would be easy to add that capability to OSVVM.

Where we currently have one big linear log file is where it gets interesting. Do you think of your separate runs as multiple separate things and the log file gets concatenated or are the log files small and need to be integrated together.

The big picture we would like to address with this change is the ability to take advantage of open source simulators and an infinite number of simulator licenses – and hence, parallelize the running of our separate simulations – because OSVVM currently has 852 to run in a regression.

Best Regards,
Jim